After the Simulation of a system design with a Custom load profile.
Most Predefined graphs are complex and can't be understood in laypeople's terms.
We used Hourly graphs to produce photographs connecting 2 or 3 parameters like Energy from the grid, Energy injected into the grid, and energy used from the chart from the hourly graphs option.
But unfortunately, I couldn't import these graphs to the existing pvsyst report.
Is there any way we can import those hourly graphs into the PVsyst report?