Hello!
I am trying to implement power limitations both at the inverter and the POI. While the latter is needed for the contractual injection limit at the POI, the former is needed for enforcing the dynamic P/Q curve of the project across the expected temp and voltage ranges at the site - a requirement placed by the regulators. Both limits need to be stacked and may result in different yields than just using the POI limit.
It seems the power limitation under energy management only allows to pick one of the two. Is there a way to implement both of them? Or would that require changing the inverter .ond? (if yes, what consequences would those changes to the .ond have?).
Happy for any suggestion ?