  1. Hi Bruno, The prompt that I get after clicking the Table says: "PVsyst6.exe has stopped working. A problem caused the program to stop working correctly. Windows will close the program and notify you if a solution is available" After I click the "close Program" button, it will shut down the PVsyst without any other prompt. I will also try to email you, the project. Thanks, Mahnam
  2. Thank you Bruno, With your explanation, I was able to input my ascii data, and see the result after simulation is complete. But however I could only see the graphs, and when I click the "Table" button, the system crashes and turns off the PVsyst, and I have to run the system again. Do you have any idea what could be my problem? Thanks, Mahnam
  3. How and where should I check? Do you have any sugestion? Thanks.
  4. Thank you Mhamon, I think with your explanation I am getting closer, but not there yet. My file is saved with MEF extension, but the files that shows up in the drop down menu are all MET extension. How can I change this? Should I change it? I think in Format protocol file I picked New Format. Should I pick PVsyst_Standard_GHI_ instead? Mahnam
  5. You are right Mhamon. When I open the "Site and Meteo" and click open under Meteo File, I don't see the ASCII file that I created and saved in the Database section. Should I check something first? Would you please comment on that? Thanks, Mahnam
  6. I already have a set of 15 minute meteo data for Jan. 2014. I have successfully entered the this data set into PVsyst from "Import ASCII meteo file". But now my problem is how to feed this meteo file into a project and analyze it. Mahnam
  7. Thank you Mhamon, Your first assumption is right. I have a data set of Jan. 2014 in 15 minute time interval. I would like to simulate this meteo data to generate and analyze power output for this period. I have already imported this file into PVsyst using "import ASCII meteo file". Now, I am wondering how to pick this file when I want to simulate a project from "Grid-Connected" "Project design". Mahnam
  8. Thank you Andre, I would like to do my analysis in a particular month (i.e. January 2014). How can I get the meteo data for that? Regard, Mahnam
  9. Thank you Mhamon, When I hit the simulation, it goes in a page that has simulation date in it. It says that it is using the year 1990, and it is a generic year. There, I cannot change the date. I need to do my analysis in a different time frame (let say, January 2014). Is it possible? Thanks for the reply, Mahnam
  10. Hi, I just got a free trial version 6 of PVsyst. Why cannot I enter a current date like 2014. The date in the simulation has been set at 1990 and I can not change it. Please provide comment. Thanks, Mahnam
×
×