  1. Hello, As we all know that the lifetime period of Solar PV Power plant is about 20 - 25 years if we properly coordinate the Operations and Maintenance protocols. We are provided with the generation data of Solar PV power plant for the 1st year with the losses diagram after we have done a simulation analysis in PVsyst.essay writer Is there any way to obtain the overall lifetime period generation of solar PV power plant with the losses diagram? Like every year we need to be provided and it has to be shown in the report as well. Also, I would suggest adding the "O&M factor" in the Detailed losses tab in the workspace. It would be great to have the standardized technical information in the background of the O&M tab to assign the value throughout the entire life period. Looking forward!
  2. Hi, I can't import meto data from PVGIS because when I try, a following error occurs: "The columns for the dates are not defined or not sufficient". It doesn't matter which database or which site I choose. Curiously, I have recently imported the PVGIS data and no problem occurred. essay writer However, then I used an older PVsyst version (I think 6.80) than now (6.85). I also imported the data directly from the PVGIS website but when I tried to use them, the error occured again. Could you tell me what the error source can be? Thanks in advance!
  3. Hi, I'm working on a project with a grid limitation of 100 MW at the injection point. The hourly .csv file shows the E_Grid is actually limited as 99.86 MW. Any idea why the discrepancy? The same issue with any other grid limitation values, checking or unchecking the separate loss box. Also, a similar issue with applying the limitation at the inverter level, except it is seen at EOutInv Best Regards,appvalley tutuapp tweakbox
×
×
  • Create New...