Performance Ratio calculation in Simulations Posted November 19, 2013 Hi Andre,Why does PVsyst calculate PR using module area as opposed to cell area? It seems like cell area would define all active generating area as opposed to module area which would include non-conductive materials like frame and exposed backsheet.Thanks!
Performance Ratio calculation
in Simulations
Posted
Hi Andre,
Why does PVsyst calculate PR using module area as opposed to cell area? It seems like cell area would define all active generating area as opposed to module area which would include non-conductive materials like frame and exposed backsheet.
Thanks!