 Post subject: Peak shaving batch mode
PostPosted: Thu Jul 30, 2020 1:13 pm 

Joined: Thu Apr 17, 2014 3:31 pm
Posts: 27
Hi,
Is it possible to change the charge/discharge power during batch mode? It looks like only number of parallel battery/rack strings can be varied
Thanks.