If degradation is included in the simulation so as to calculate the output for a specific year should the LID loss factor be set to 0% since the Year 0 warranted output as defined in the "Ageing" tab already includes LID losses.

I.e. Will LID losses be counted twice if defined in the "Module quality - LID - Mismatch" tab if degradation is included?


Top
   
PostPosted: Thu Sep 21, 2017 8:39 pm 
User avatar

Joined: Mon Apr 16, 2012 7:29 pm
Posts: 1616
See our FAQ How to interprete the warranty curve of the manufacturers?


Top
   
PostPosted: Wed Feb 28, 2018 6:12 pm 

Joined: Wed Feb 28, 2018 5:48 pm
Posts: 1
In PVsyst 6 HELP, in the point about AGEING http://files.pvsyst.com/help/index.html there is this note:

"NB: The simulation for a given year takes the average loss calculated mid year. For example for the 10th year of operation, the ageing loss factor will be calculated over 9.5 years.
For the usual simulations of PVsyst (first year) we should indeed consider the degradation after 6 months (0.2% in our example). This is usually neglected"

And I would like to know why for the first year operation it is used the degradation after 6 months and is not used the degradation for the whole year.

Thank you.


Top
   
PostPosted: Thu Mar 01, 2018 10:53 am 

Joined: Wed Feb 28, 2018 5:23 pm
Posts: 1
In the PV Syst Help page, it is said this note about ageing:

"NB: The simulation for a given year takes the average loss calculated mid year. For example for the 10th year of operation, the ageing loss factor will be calculated over 9.5 years.
For the usual simulations of PVsyst (first year) we should indeed consider the degradation after 6 months"

I would like to know why it is calculated like this way.


Top
   
PostPosted: Fri Jan 04, 2019 5:17 pm 

Joined: Thu Jan 03, 2019 10:59 am
Posts: 2
Hello, I am interested also in this topic. I want to combine LID losses for the first year (as that is the definition of LID losses) and ageing but, when I check the report for any year I see LID losses applied for all years and that is wrong. Do you have this problem also? If so, Have you been able to fix this? Thank you in advance.

Best Regards,
Eduardo Jimenez


Top
   
PostPosted: Wed Sep 18, 2019 9:56 pm 

Joined: Wed Sep 18, 2019 9:49 pm
Posts: 1
Quote:
In the PV Syst Help page, it is said this note about ageing:

"NB: The simulation for a given year takes the average loss calculated mid year. For example for the 10th year of operation, the ageing loss factor will be calculated over 9.5 years.
For the usual simulations of PVsyst (first year) we should indeed consider the degradation after 6 months"

I would like to know why it is calculated like this way.
I have the same question. Do you have a specific technical justification for this? is this because of data granularity?

thank you


Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 6 posts ] 

All times are UTC+02:00


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Limited