PostPosted: Fri Feb 20, 2015 5:34 pm 

Joined: Fri Feb 20, 2015 5:24 pm
Posts: 2
Good afternoon,´

My consult is about how to interpret the suggested capacity of the battery given by the pvsyst at the top-right corner of the components selection window. My Suggested battery capacity is 2000 A-h.
I know that the database of the batteries in the software rate the capacity at C10 , however, i got a calculation from another software made by a distributor of battery banks resulting of an equal value but telling me that the value is at C100 because the calculation for the battery uses an amount of energy that will be used by 7 days ( my autonomy is seven days) and that amount of hours is something like 168 h, therefore i had to buy a battery of 2000A-h at C100 because 100 hours is "closer" to 168 hours.

kind regards,

Miguel Guevara


Top
   
PostPosted: Tue Mar 10, 2015 12:56 pm 
User avatar

Joined: Mon Apr 16, 2012 7:29 pm
Posts: 1680
As you mentioned, the battery bank estimation in PVsyst is expressed as C10 value, as the "characteristic capacity" specifying the batteries in PVsyst is C10.

However these sizing results should only be interpreted as a rough estimation.
There is no absolute way of defining the size of a battery bank, as this depends mainly on the meteo variability, and the eventual unequal use of the electricity.

In PVsyst, the estimation is performed by:
- generating a synthetic daily data set from the Monthly meteo data.
- performing a quick (simplified) simulation during this full year.
- estimating the probability of "loss of load" (PLOL, user's disrupting time), and adjusting the battery bank according to your specification.
Now this process is mainly dependent on the worst days sequence in the meteo data, which is highly variable, and depends on the synthetic generation.

In a next version of PVsyst we will provide a tool for performing a large set of Synthetic generations and analyze the probability distribution.


Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 2 posts ] 

All times are UTC+02:00


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Limited