jforbess Posted February 3, 2016 Share Posted February 3, 2016 I was running batch mode and examining the reports in saved Calculations, I discovered that though the report lists 0.8% as availability input, it showed 0.0% availability in the loss waterfall for all runs except the first run. I observed this in 6.37, 6.39 and 6.41. (I don't have 6.38 and 6.40 installed.) Link to comment Share on other sites More sharing options...
André Mermoud Posted February 8, 2016 Share Posted February 8, 2016 The "Availability" parameter defines periods of Failure (which may be generated randomly if desired)They could be defined for example by night, therefore leading to no loss. Please check that in your "Detailed Losses" the failure periods really occur during significant production times. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now