Jump to content

Simulate 1 minute power output based on measured 1 second data


aarabi

Recommended Posts

Hello,

I have 3 months of 1 second measured data (GHI,Temperature, WS, RH) and would like PVsyst to use this data to generate the corresponding 1-minute [at least] or ideally the 1-second power output. Is this possible?

I am aware of the possibility of producing hourly .csv output. But can I output at smaller intervals?

As a background, the reason why I need such simulation is to assess the ramp rate (variability) of a multi-MW PV system power output.

Many thanks in advance,

Ahmad

Link to comment
Share on other sites

  • 7 years later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...