serafin Posted August 4, 2014 Posted August 4, 2014 hello,How should I read the System output power distribution graph coming out as a predefined graph on the results? Can you explain me the interpretation of the graph?Thank you,
André Mermoud Posted August 12, 2014 Posted August 12, 2014 The axis labels of this plot are indeed not correct. I was not aware of that, and will correct for the next version 6.27.The horizontal axis is the instantaneous output power (i.e. for a given hour). The bins accumulate all the energies registered for this power along the full year (or simulation period). I.e. the sum of all hourly energies for which the output power was in this bin range.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now