Jump to content

PR is above 100% after PVSyst simulation for vertical Panels (90°) in Ground Mount arrangement.


Recommended Posts

Posted
Greetings,
 
While doing a PVSyst simulation for a project having vertical panels(90°) on a ground mount arrangement, I get an unexplainable PR of 122% for the given orientations, also th global incident is in negative.
 
I have attached the PVSyst Report for you refrence, please provied an answer

image.png.d61136d9217963e07612333c2803a9da.pngimage.png.5aba9842a27fee905c86839a9c35dab9.pngimage.png.6d0f18afa660f1ef781bd127c7e8b349.png

Posted

Hello, to better assist you with your issue please send the export of your project in zip format to our support : support@pvsyst.com

Regards

Posted

This is normal, since PR is defined normalized by the front-side POA irradiance (GlobInc) but bifacial modules can also capture light from the back.
The PR of bifacial projects is oftentimes > 1.

There are more details on this help page: https://www.pvsyst.com/help/performance_ratio.htm

Regarding the negative Global Incident, this is also normal, because it accounts for the front side irradiance relative to the horizontal plane. If you just look at the front-side, there is more irradiance on a horizontal plane than on a vertical plane. This is of course more than compensated by the backside irradiance part of the loss diagram.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...