Doris Posted November 24, 2022 Posted November 24, 2022 (edited) Without changing any setting, I found that key values from a batch simulation, such as EArrNom, EArrMPP, EOutInv, E_Grid, are different from those obtained from an ordinary simulation and those from the hourly output. I tested on two .PRJ and both showed the same. May I know what has gone wrong and which set of values is more reliable? Edited November 24, 2022 by Doris
Emanuel Rodriguez Posted December 26, 2022 Posted December 26, 2022 They shouldn't be so different, could you please share values from ordinary simulation and the CSV files o XLSX from batch simulation?