I would need to know what criteria the program uses to consider that energy is injected into the network. That is, from what parameters (%P or %S, temperature, irradiance,...) considers the program that is injected into the network. I wanted to know if it is possible to limit the operation of the inverter from 0.5%P or if there is no limitation. Thanks in advance.

Posted

The inverter nominal and maximal power are defined in the OND files. There is also a parameter called 'Power threshold' which defines from which power on the inverter starts converting DC to AC power.

  • 2 weeks later...
Posted
On 10/17/2022 at 1:05 PM, Bruno Wittmer said:

The inverter nominal and maximal power are defined in the OND files. There is also a parameter called 'Power threshold' which defines from which power on the inverter starts converting DC to AC power.

Thanks for your reply. However, we have seen in some simulations that PVsyst starts to consider that energy is supplied below the "Power threshold". This is the data that we would need to know, in case we could modify our files. Thank you in advance

  • 2 weeks later...
Posted

Thanks for your reply. However, we have seen in some simulations that PVsyst starts to consider that energy is supplied below the "Power threshold". This is the data that we would need to know, in case we could modify our files. Thank you in advance

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...