Greetings,

I'm doing a project and I've found out a bug on the PR calculations.

In the PVsyst Report attached the PR average for the first year is 80,9%PVSyst_Report_Fortissue 2,73 MWp (JA 540W).zip, when in fact the calculations are wrong the correct value must be 83,5%.

I've downloaded the User Hourly and checked the values in a excel PR Bug excel file.zip, all figures are correct, only that PR percentage.

This is the first time that this has happened on the hundreds of projects that I've done.

Imagem1.png.6661bc99f1463fe422de3e80979a5aae.png