sergio Posted March 11, 2021 Posted March 11, 2021 I have to simulate the following performances: (i) Produce a power output of at least ninety-seven-point eight percent (97.8%) of theminimum power output specified in the applicable module data sheet during the firstsix (6) months following the Warranty Start Date considered as the average of themeasures(ii) Produce a power output of at least ninety-seven-point five percent (97.5%) of theminimum power output specified in the applicable module data sheet during thetwelve (12) months following the Warranty Start Date.(iii) have a yearly maximum decrease (or degradation) of power of not more than zeropoint five percent (0.5%) from start of the second (2nd) twelve (12)-month periodfollowing the Warranty Start Date until the end of such twelve (12)-month period, andrepeated for each successive twelve (12)-month period until the twenty-fifth (25th) anniversary of the Warranty Start Date.Is PVsyst be able to perform what listed above? And in case, which are the related graphs?Thanks in advanceSergio
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now