oyautc Posted June 3, 2020 Share Posted June 3, 2020 I need to analyze for the panels to be installed on the facade of the building .(Not rooftop) But, what steps need to be followed for the facade of the building. When I select Tilt 90 degrees and try to analyze it, the PVsyst system is locked. Do I need to choose a different option? Link to comment Share on other sites More sharing options...
André Mermoud Posted June 9, 2020 Share Posted June 9, 2020 Yes sorry, this is a bug that we have just discovered yesterday. If you are using a Version 7.0.0, please install the patch 7.0.1, released today. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now