Sebastian.stan Posted October 30, 2019 Posted October 30, 2019 Hi Andre, I'm working on a project with a grid limitation of 100 MW at the injection point. The hourly .csv file shows the E_Grid is actually limited as 99.86 MW.Any idea why the discrepancy? The same issue with any other grid limitation values, checking or unchecking the separate loss box. Also, a similar issue with applying the limitation at the inverter level, except it is seen at EOutInvBest Regards,Sebastian