Michele,
 
	Thank you for the input!  
 
	I'd assumed it would be a batch mode method out of shear ignorance.  Batch mode "looked right".  I need a set of 5 days running to show a Performance Ratio demonstrating the system meets warranty, a substantial completion requirement.  The comparison is required to show Actual Revenue vs weather corrected predicted revenue.  I had assumed there'd be a way to run 5 days with the actual data.  Duke requires GlobHor, T_Amb, GlobInc, EArrMPP, EArray, TArray, EOutInv, E_Grid.
 
	I was able to run it, and have 2 CSV file, BatchParams and BatchResults.  I didn't change BatchPArams at all before tunning, so I am assuming BatchResults is incomplete.
 
	What I need to know - how can I enter values for the variable above to produce a PVsyst report?
 
	From my reading the production ratio they want is theoretical output corrected for actual weather divided by actual output.  I have the actual output and can put it in, and I have the actual weather and can put it in.  Theoretical output is modelled per their requirements.  Is it possible to get the Production Ratio Chart to reflect these values ?